Data used on this map
Every item is labelled: REAL DATA comes from an official or open source; ESTIMATE is an informed estimate for discussion.
Traffic-monitoring platforms
What exists, what it costs, and who can sign up.
Designing for plows, salt & dark afternoons
Rules of thumb so every measure still works in February.
- Paint is a summer supplement only. Every measure must work when lines are buried under snow.
- Vertical measures (humps, tables, cushions) are key-cut / anchored into the pavement with gradual 2 m tapers so plow blades can't catch (Halifax practice).
- Horizontal measures (curb extensions, islands) use gradual tapers, mountable / rounded noses, catch-basin relocation, and reflective markers + snow stakes. Model plow turning paths.
- Keep plow-width lanes — ≥3.0–3.3 m is typical; confirm with Public Works.
- Salt: use air-entrained concrete over asphalt for islands; avoid plastic modules without snow-belt testing.
- Seasonal tactical: flex posts April–November to test a layout, then pour concrete.
- Signals, beacons and lighting are winter-immune — prioritize them for December–February, when it is dark by 4:35 pm.
- Dig once: bundle calming with the 2025–26 Champlain rehab, the Gauvin/LeBlanc reconstruction, and the Dieppe Blvd extension.
- Accessibility: Dieppe's 2010 traffic button at Notre-Dame/Gould was removed in 2015 after a human-rights complaint — include tactile cues.
Key-cut speed table — side profileGradual tapers let plow blades ride up instead of catching an edge.
Refuge island — top viewMountable rounded noses, reflective markers and snow stakes so operators can find the curb.
How the scores work
Impact score (1–10, estimate)
A judgement score combining three things:
- Traffic exposure — official NB DTI AADT counts where available, plus number of lanes and posted speed (OSM
lanes / maxspeed tags).
- Vulnerable users — schools and parks within roughly 300 m.
- Crossing gap — unmarked or uncontrolled crossings, or long multi-lane crossings.
Cost ranges
Built up from cited unit costs in the Toolbox (Ottawa, Moncton, Port Moody, Port Alberni, Calgary, FHWA). Shown in CAD as low–high ranges and labelled as estimates.
Value score (estimate) = impact per dollar
The square root softens cost so a cheap but low-impact fix doesn't automatically beat a high-impact one. The best-value hotspot scores 100; the others are relative to it.
Cost tiers (by the high end of the range): $ ≤ $25k · $$ ≤ $100k · $$$ ≤ $500k · $$$$ above.
Caveats
- This is not engineering. Every location needs a site review.
- I found no public street-level collision data for Dieppe (request it from Codiac RCMP / NB DTI).
- Volumes are missing for municipal streets such as Boulevard Dieppe.
- Confirm everything with City of Dieppe Engineering and NB DTI.
- Champlain (Routes 106/132), Acadie and Amirault (Route 106) are provincial numbered routes: changes there need both the City and NB DTI. Policy C-1 petitions cover residential and collector streets only, so use Council and DTI asks for the arterials.
How to get this done
- 1
Petition under Policy C-1. Two-thirds of households on the street sign.
- 2
City speed & volume study. Devices are offered if the thresholds in Policy C-1 are met.
- 3
Install. Two-thirds of households accept the design, then the City builds it.
Asks for Council
- Join Waze for Cities (free for public agencies) and Google Project Green Light (signal timing).
- Put Telraam sensors on Champlain and Dieppe Blvd to collect the speed data Policy C-1 asks for.
Inspired by
Streetcraft's video “What If We Could Fix Our Roads For Cheaper?” argues that safety fixes don't have to be slow or expensive:
- Quick builds — low-cost installations that test a design and build community trust.
- Modular roundabout, Orange County, FL — installed in under 3 weeks, at roughly half the cost of a ~$1.5M conventional roundabout.
- Dig once — Baltimore coordinates utility and street work so a street is opened once, not three times.
- Neighbourhood greenways, Portland — residential and school streets designated for walking and biking.
- Road diet, Des Moines — crashes −50%, speeds down ~10 mph after a 6-month pilot.